Salinity Management Pipeline

Job Name:                       Salinity Management Pipeline, Phase 1e

Client:                             Calleguas Municipal Water District

Project Value: $23.8 million

Completion Date:             July 2012

Description of work:       The project includes installation of 10,784’ of 48” welded steel pipe, 894’ of 12” welded steel pipe, installation of 766’ of 62” diameter and 84’ of 30” diameter steel casing by trenchless installation methods, 97’ of 62” diameter steel casing by open cut, a flow control station, a meter station, and by-pass piping